Note of the high-altitude operations

254阅读 0评论2012-05-03 sinolifter
分类:IT业界

 

 

 

Who work in the high ground two meters or more locations, should be regarded

as work at heights. Who can work well in advance on the ground, must be on

the ground, to minimize work at heights.

 

 

 

As workers in high places must be in good health, suffering from mental

illness, epilepsy and by the physician identification of people with high

blood pressure, heart disease and other staff should not be engaged in work

at heights disease, are not allowed to participate in the work at heights.

Where staff drinking, lack of energy, the ban on climbing operation.

 

 

Third, work at heights are required scaffolding or fall measures taken to

prevent a team before they are allowed.

 

 

The edge of the crest, steep roofs, cliffs, towers, drawbridge and other

dangerous work, the invading side shall be equipped with a safety net or

protective railings, or staff are required to use seat belts.

 

 

Cliffs, steep venue or on the sidewalk of snow, gravel, soil to be more

frequent cleaning shall be provided, relying on the outside side of the 1-

meter-high railings. Located 18 cm high wall or earth mound inside of the

railing to prevent falling objects wounding.

 

 

6, no scaffolding or work on scaffolding without railings, and more than 1.5

meters in height, must use seat belts, or other reliable security measures.

 

 

, Seat belts before use should be checked, and should periodically (every six

months) for static load tests, the test load of 225 kg, the test time is five

minutes after the test to check for deformation, rupture, and do a good test

record. Substandard seat belts should be a timely manner.

 

 

 

, Seat belt hook or rope should be hanging in a strong and solid components,

or designed for hanging belts of wire rope. Ban hanging on the move or not a

solid object.

 

 

 

Nine, the height shall be using the tool bag. Tool application rope tied to

the solid components are not allowed to misplacing an accident in order to

prevent falls from a height.

 

 

10, during the height work, unless the officer, are not allowed to others in

the workplace the following line or stay below the place of work should be a

fence or installation of other protective devices to prevent the assault of

the litter. Work in the grille platform, in order to prevent the fall of

tools and equipment, shall be paved with wood.

 

 

 

11 are not allowed to tools and materials up and down throwing to use

tethered firmly down or to the hanging sent to avoid injuring staff below or

destroyed scaffolding.

 

 

12, upper and lower work, in the middle must be erection of a tight and firm

protective partitions, coverings or other isolation facilities, staff must

wear a helmet.

 

 

XIII, below minus ten degrees in winter open height, should be necessary in

the construction area near a rest of the heating, heating equipment shall

have special management attention to fire safety.

 

 

14, 6 and above, high winds and heavy rain, thunder, fog and other inclement

weather, they should stop the open-air work at heights.

 

 

15 to prohibit the board in the solid structure (such as asbestos roof) work.

Necessary to place this structure in order to prevent accidental board should

put up warning signs.

上一篇:Uses plus things about a marketing and advertising engraving product
下一篇:work at heights