1, work at heights, you should pay attention to the following requirements:

1) Where, workers in high places must be qualified by a medical examination

before proceeding to work at heights. Persons suffering from mental illness,

epilepsy, high blood pressure, vision and hearing are serious obstacles to be

allowed to engage in work at heights. 2) ascended to erection operations

(such as scaffolders, the tower crane to install the demolition work, etc.)

must be specialized training, holding labor safety supervision department

issued a "special jobs safe operation certificate after passing the

examination, shall be allowed to start to work. 3) workers in high places who

participated in the pre-construction safety education, and pass the

examination. 4) participate in the workers in high places should be required

to wear a helmet, tied belts, clothing in line with the requirements of work

at heights, wear soft-soled shoes, do not wear slippery shoes with nails, and

should seriously do ten are not allowed to : not allowed illegal operations;

before the two are not allowed to work and working hours to drink; three are

not allowed to rest in an insecure location; four are not allowed to throw

things at random to the following; five serious lack of sleep are not allowed

to work at heights ; six are not allowed to bet a grudge; seven are not

allowed to tamper with the machinery, fire and dangerous goods appliances;

eight are not allowed to break the rules require the use of safety supplies,

 

appliances; nine are not allowed to chasing at high operating area; ten are

not allowed to disassemble damage to the security of supplies, equipment and

facilities. 5) carry the tools of workers in high places should be bagged

carefully custody, larger tools should be put away, put in prison, and

regional construction materials to be placed on security does not affect the

prevailing, if necessary, to be strapped. 6) construction personnel to adhere

to the cleaning system every day before work, so that the net site of the

work completed, materials clear. 7) The lifting construction in hazardous

areas, fences and warning signs to prohibit pedestrians and stay in lifting

objects. 8) night work at heights must be equipped with adequate lighting. 9)

must be carefully to execution Guodiangongsi provisions related to the

standardization of safety facilities, and to keep pace with the construction

schedule. If you can not sync with the progress of even the best security

facilities to no avail. 10) try to avoid the interchange operations,

interchange operations have appropriate security quarantine measures, no

measures prohibited the construction. 11) a high place before the security

technology correspondent, job security facilities defects and hidden dangers

must be tackled immediately, endanger the physical safety must cease

operations. 12) in height hoisting construction, pay close attention to the

seasons of climate change, in case of heavy rain, 6 and above high winds, fog

and other inclement weather, open-air operations should be stopped, and do a

good job of lifting components, machinery and other solid. 13) the height of

summer to do summer cooling, do antifreeze in winter, cold, non-slip work.

14) work at heights must be a reliable protective measures. Vacant work at

heights, rigging, hoists, hanging baskets, platforms and other equipment and

facilities shall be subject to technical appraisal or inspection before use.

Reliable protective measures must not be constructed. Particularly in the

specific construction projects more difficult to take protective measures,

but also to create conditions to ensure the reliability of the safety

precautions. Special construction environment, safety belts, there is no

place to hang, then need to find ways to make protective equipment at the

hanging, and to safe and reliable. 15) at heights in the materials used must

be smooth, stacked and can not be placed on the limb near the entrance to the

cave operations in the corridor, the channel plate and ascend appliances must

always be cleaned. Demolition materials, residual materials and waste should

be cleaned up promptly carried away, shall be subjected to arbitrary chaos

set down discarded. The construction workplace, wherever possible, the

falling of any material, must be first removal of, or be secured to prevent

falling wounding. 16), the scene shift system, before the shift to the class

staff made clear matters related to prevent blindly job accident. 17)

seriously overcome the management of ***ual violation. Two protective

measures my Department for work at heights construction project: construction

of high Anchor spray concrete pouring of the export of tail water safety

mode, the tower crane lifting, lifting mixing plant, the construction should

note the following protection: 1, "Sambo "Protection 1) any person to enter

the construction site must wear a helmet in accordance with the standard. 2)

Where in a high place or vacant jobs must be hung well meet the standards and

operational requirements of the seat belt. 3) work at heights below the point

must be located on the safety net, where there is no external scaffolding

construction as a protection, must be located in the first layer or ground

clearance 4m at a fixed safety net. 2, set aside a larger reserve of port

protection port located at the edge of the mouth of the protective fence

height of 1.2m, and set aside the mouth with Tai seal; general 1m square or

diameter of less than 1m set aside the mouth can be welded steel mesh

reinforcement fixed in the reserved port, mesh side length 8cm, this should

be above the mouth of the shop for wooden or cover reclosable safety signs.

3, the protection of the limb in the tail water exports pit excavation, in

the erection of the unloading platform, the limb side to have protective

measures, shall be a fence or the erection of a safety net. Climbing job

protection in the concrete construction of tail water exports, with the rise

of the dam must be rising job, climbing jobs prone to danger, workers

throughout the construction period, the top and bottom of all categories of

personnel are specified channel to walk, not allowed to use the boom or

scaffolding pole pieces of construction equipment to climb. Climb, regardless

of what kind and form of the ladder should be checked in advance in

accordance with the relevant standards and acceptance. 5, the protection of

the vacant job ERECTION steel banding and concrete pouring and other vacant

jobs, cable-suspended scaffold boards, hanging plate, hoists, platforms and

other equipment and tools should be tested the identification of qualified

products. This works mainly vacant jobs for steel banding, steel banding, it

is careful not to stand or climb up and down on a steel skeleton. 6, the

protection of the cross-operating construction site formwork, form removal

and dismantle scaffolding up and down different levels of work at heights,

known as cross-operating, up and down the three-dimensional cross-operation

can easily result in falling objects wounding, therefore, between the up and

down at different levels , the first in the front and rear, left and right

direction there must be a horizontal safety isolation distance, this distance

should be greater than the radius of the fall. If you can not achieve this

safety isolation distance should be the device to prevent fall below the

material damage the protective layer, the main tension safety net, according

to the load height of to choose the width of the flat screen, secure online

all the rope section or node, you must fixed. , Job alerts, guardianship

damage range in height operating range and height of litter shall be provided

with safety warning signs, and the designated persons for safe custody, to

prevent access to the operating range and litter wounding hope to be able to

help you