1, work at heights, you should pay attention to the following requirements:
1) Where, workers in high places must be qualified by a medical examination
before proceeding to work at heights. Persons suffering from mental illness,
epilepsy, high blood pressure, vision and hearing are serious obstacles to be
allowed to engage in work at heights. 2) ascended to erection operations
(such as scaffolders, the tower crane to install the demolition work, etc.)
must be specialized training, holding labor safety supervision department
issued a "special jobs safe operation certificate after passing the
examination, shall be allowed to start to work. 3) workers in high places who
participated in the pre-construction safety education, and pass the
examination. 4) participate in the workers in high places should be required
to wear a helmet, tied belts, clothing in line with the requirements of work
at heights, wear soft-soled shoes, do not wear slippery shoes with nails, and
should seriously do ten are not allowed to : not allowed illegal operations;
before the two are not allowed to work and working hours to drink; three are
not allowed to rest in an insecure location; four are not allowed to throw
things at random to the following; five serious lack of sleep are not allowed
to work at heights ; six are not allowed to bet a grudge; seven are not
allowed to tamper with the machinery, fire and dangerous goods appliances;
eight are not allowed to break the rules require the use of safety supplies,
appliances; nine are not allowed to chasing at high operating area; ten are
not allowed to disassemble damage to the security of supplies, equipment and
facilities. 5) carry the tools of workers in high places should be bagged
carefully custody, larger tools should be put away, put in prison, and
regional construction materials to be placed on security does not affect the
prevailing, if necessary, to be strapped. 6) construction personnel to adhere
to the cleaning system every day before work, so that the net site of the
work completed, materials clear. 7) The lifting construction in hazardous
areas, fences and warning signs to prohibit pedestrians and stay in lifting
objects. 8) night work at heights must be equipped with adequate lighting. 9)
must be carefully to execution Guodiangongsi provisions related to the
standardization of safety facilities, and to keep pace with the construction
schedule. If you can not sync with the progress of even the best security
facilities to no avail. 10) try to avoid the interchange operations,
interchange operations have appropriate security quarantine measures, no
measures prohibited the construction. 11) a high place before the security
technology correspondent, job security facilities defects and hidden dangers
must be tackled immediately, endanger the physical safety must cease
operations. 12) in height hoisting construction, pay close attention to the
seasons of climate change, in case of heavy rain, 6 and above high winds, fog
and other inclement weather, open-air operations should be stopped, and do a
good job of lifting components, machinery and other solid. 13) the height of
summer to do summer cooling, do antifreeze in winter, cold, non-slip work.
14) work at heights must be a reliable protective measures. Vacant work at
heights, rigging, hoists, hanging baskets, platforms and other equipment and
facilities shall be subject to technical appraisal or inspection before use.
Reliable protective measures must not be constructed. Particularly in the
specific construction projects more difficult to take protective measures,
but also to create conditions to ensure the reliability of the safety
precautions. Special construction environment, safety belts, there is no
place to hang, then need to find ways to make protective equipment at the
hanging, and to safe and reliable. 15) at heights in the materials used must
be smooth, stacked and can not be placed on the limb near the entrance to the
cave operations in the corridor, the channel plate and ascend appliances must
always be cleaned. Demolition materials, residual materials and waste should
be cleaned up promptly carried away, shall be subjected to arbitrary chaos
set down discarded. The construction workplace, wherever possible, the
falling of any material, must be first removal of, or be secured to prevent
falling wounding. 16), the scene shift system, before the shift to the class
staff made clear matters related to prevent blindly job accident. 17)
seriously overcome the management of ***ual violation. Two protective
measures my Department for work at heights construction project: construction
of high Anchor spray concrete pouring of the export of tail water safety
mode, the tower crane lifting, lifting mixing plant, the construction should
note the following protection: 1, "Sambo "Protection 1) any person to enter
the construction site must wear a helmet in accordance with the standard. 2)
Where in a high place or vacant jobs must be hung well meet the standards and
operational requirements of the seat belt. 3) work at heights below the point
must be located on the safety net, where there is no external scaffolding
construction as a protection, must be located in the first layer or ground
clearance 4m at a fixed safety net. 2, set aside a larger reserve of port
protection port located at the edge of the mouth of the protective fence
height of 1.2m, and set aside the mouth with Tai seal; general 1m square or
diameter of less than 1m set aside the mouth can be welded steel mesh
reinforcement fixed in the reserved port, mesh side length 8cm, this should
be above the mouth of the shop for wooden or cover reclosable safety signs.
3, the protection of the limb in the tail water exports pit excavation, in
the erection of the unloading platform, the limb side to have protective
measures, shall be a fence or the erection of a safety net. Climbing job
protection in the concrete construction of tail water exports, with the rise
of the dam must be rising job, climbing jobs prone to danger, workers
throughout the construction period, the top and bottom of all categories of
personnel are specified channel to walk, not allowed to use the boom or
scaffolding pole pieces of construction equipment to climb. Climb, regardless
of what kind and form of the ladder should be checked in advance in
accordance with the relevant standards and acceptance. 5, the protection of
the vacant job ERECTION steel banding and concrete pouring and other vacant
jobs, cable-suspended scaffold boards, hanging plate, hoists, platforms and
other equipment and tools should be tested the identification of qualified
products. This works mainly vacant jobs for steel banding, steel banding, it
is careful not to stand or climb up and down on a steel skeleton. 6, the
protection of the cross-operating construction site formwork, form removal
and dismantle scaffolding up and down different levels of work at heights,
known as cross-operating, up and down the three-dimensional cross-operation
can easily result in falling objects wounding, therefore, between the up and
down at different levels , the first in the front and rear, left and right
direction there must be a horizontal safety isolation distance, this distance
should be greater than the radius of the fall. If you can not achieve this
safety isolation distance should be the device to prevent fall below the
material damage the protective layer, the main tension safety net, according
to the load height of to choose the width of the flat screen, secure online
all the rope section or node, you must fixed. , Job alerts, guardianship
damage range in height operating range and height of litter shall be provided
with safety warning signs, and the designated persons for safe custody, to
prevent access to the operating range and litter wounding hope to be able to
help you